Share Revamping Kotuku Park playground on FacebookShare Revamping Kotuku Park playground on TwitterShare Revamping Kotuku Park playground on LinkedinEmail Revamping Kotuku Park playground link
Consultation has concluded
In October the community voted on two designs for Kotuku park playground. During this stagewe heard feedback that the equipment choices weren’t quite right, so we met with locals to fine-tune the designs and we ran a second round of voting. You can read more on the first voting stages at Round 1 information.
Votes closed on 21 December 2020 and showed that option 2 is the favoured design.
Option 2 includes a full swing set (two for toddlers, two for older kids), a pod swing, module with climbing net and slide, cube climbing nets and rock-climbing wall, slatted barrel for exploring, see-saw and wooden boat, alongside natural seating and planting.
Installation will be completed by June 2021 and we will update the community on our Facebook page when construction is beginning, but reassured it will be after the January school holidays.
Option 1
Includes:
full swing set (two for toddlers, two for older kids)
pod swing
caterpillar and double wave slide
climbing/ spinning module
standing gyroscope
slatted barrel for exploring, and
springy aeroplane and wooden plane for imaginative play.
Option 2
Includes:
full swing set (two for toddlers, two for older kids)
pod swing
module with climbing net and slide
cube climbing nets and rock wall
slatted barrel for exploring
see-saw, and
wooden boat for imaginative play.
In October the community voted on two designs for Kotuku park playground. During this stagewe heard feedback that the equipment choices weren’t quite right, so we met with locals to fine-tune the designs and we ran a second round of voting. You can read more on the first voting stages at Round 1 information.
Votes closed on 21 December 2020 and showed that option 2 is the favoured design.
Option 2 includes a full swing set (two for toddlers, two for older kids), a pod swing, module with climbing net and slide, cube climbing nets and rock-climbing wall, slatted barrel for exploring, see-saw and wooden boat, alongside natural seating and planting.
Installation will be completed by June 2021 and we will update the community on our Facebook page when construction is beginning, but reassured it will be after the January school holidays.
Option 1
Includes:
full swing set (two for toddlers, two for older kids)
pod swing
caterpillar and double wave slide
climbing/ spinning module
standing gyroscope
slatted barrel for exploring, and
springy aeroplane and wooden plane for imaginative play.
Option 2
Includes:
full swing set (two for toddlers, two for older kids)
Share Vote for your favourite design on FacebookShare Vote for your favourite design on TwitterShare Vote for your favourite design on LinkedinEmail Vote for your favourite design link
Share Vote for your favourite fine-tuned design on FacebookShare Vote for your favourite fine-tuned design on TwitterShare Vote for your favourite fine-tuned design on LinkedinEmail Vote for your favourite fine-tuned design link
Signup Banner
to join the conversation!
Current Kotuku Park playground
Project stages
Share your ideas
Revamping Kotuku Park playground has finished this stage
Public consultation to get feedback on initial ideas for Kotuku Park playground.
Voting on preferred design opens
Revamping Kotuku Park playground has finished this stage
29/10/2020
Voting on preferred design closes
Revamping Kotuku Park playground has finished this stage
09/11/2020
Preferred design fine-tuning
Revamping Kotuku Park playground has finished this stage
November 2020
Voting on fine-tuned design opens
Revamping Kotuku Park playground has finished this stage
11/12/2020
Voting on fine-tuned design closes
Revamping Kotuku Park playground is currently at this stage
21/12/2020
Playground revamped
this is an upcoming stage for Revamping Kotuku Park playground