Revamping Matai Road Reserve playground

Share Revamping Matai Road Reserve playground on Facebook Share Revamping Matai Road Reserve playground on Twitter Share Revamping Matai Road Reserve playground on Linkedin Email Revamping Matai Road Reserve playground link

Consultation has concluded

We have heard from a really good cross-section of our community, and option 1 is the favoured design.

The installation will be completed by June 2021 and we will update the community on our Facebook page when construction is beginning. If you would like more information please email playgrounds@kapiticoast.govt.nz


Option 1

Includes:

  • Slide
  • Cargo net
  • Climbing/balancing component and rock wall
  • Two spring balance boards and a spinner
  • Double swing and a basket swing.

Matai Road Reserve playground - option 1 image of swings.Matai Road Reserve playground - option 1 image of entire concept.

Matai Road Reserve playground - option 1 image of entire playground concept.

Note: click on images to see them at full size

We have heard from a really good cross-section of our community, and option 1 is the favoured design.

The installation will be completed by June 2021 and we will update the community on our Facebook page when construction is beginning. If you would like more information please email playgrounds@kapiticoast.govt.nz


Option 1

Includes:

  • Slide
  • Cargo net
  • Climbing/balancing component and rock wall
  • Two spring balance boards and a spinner
  • Double swing and a basket swing.

Matai Road Reserve playground - option 1 image of swings.Matai Road Reserve playground - option 1 image of entire concept.

Matai Road Reserve playground - option 1 image of entire playground concept.

Note: click on images to see them at full size

  • CLOSED: This survey has concluded.
    Consultation has concluded
    Share Vote for your favourite design on Facebook Share Vote for your favourite design on Twitter Share Vote for your favourite design on Linkedin Email Vote for your favourite design link